top of page

Final Report

Located in Charlottesville, VA, 500 Ray C. Hunt Drive is found within the Fontaine Research Park near the intersection of Route 29 and Fontaine Avenue. The building was originally constructed in 1993 as the headquarters office building for the University Physicians Group. The project consists of remodeling the existing 62,709 SF, 4-story office building. During construction, the facility is unoccupied. The following document is a final report of three analyses and a research topic that relate to both 500 Ray C. Hunt Drive and the construction industry.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Kaidy Wollman. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on March 31, 2017 by Kaidy Wollman

bottom of page